Bradford Beck

Bradford Beck Naturalisation Scheme


Option 01

Naturalised Beck scheme using retaining walls to provide improved channel to replace culverted section. Improving water flow and increased water capacity.


Option 02

Naturalised Beck scheme with meandering watercourse, improved water flow with pools, riffles and back water. This scheme replicates the natural form without the need for large retaining structures. This proposal fully opens up the Bradford Beck and provides access to a once hidden watercourse.